BLOCKBRIEFING
Blockchain Technology

Ethereum Developers Target December 15 for Hoodi Glamsterdam Upgrade

Pop-art illustration of Ethereum, connected servers and a calendar representing the planned testnet upgrade

Ethereum developers have set a new target of December 15 for testing the Glamsterdam upgrade on Hoodi. The planned testnet activation is a step toward validating the network changes after an earlier postponement. It does not establish a date for deploying the upgrade on Ethereum’s main network.

A Hoodi configuration proposal submitted on November 26 specifies activation at 19:12:24 UTC on December 15, 2026. A matching change was merged into the development branch of the Lodestar consensus client on November 26. The shared Hoodi configuration proposal remained open at the time of review.

Developers agree on a new testing target

The changes follow Ethereum’s November 26 All Core Developers consensus meeting. The agenda included whether the execution layer was ready for the testnet upgrade and whether developers should set a new date or defer testing.

The merged Lodestar change records the rescheduling decision and specifies epoch 143,616, corresponding to slot 4,595,712. A slot is a time interval in which Ethereum can produce a block. An epoch groups 32 slots.

The timing is internally consistent: multiplying the specified slot by 12 seconds and adding Hoodi’s genesis timestamp of 1,742,213,400 yields 1,797,361,944, the Unix timestamp recorded in the configuration. This is a scheduled activation condition, not evidence that the fork has already taken place.

What the 200 million gas limit means

The configuration also plans to raise Hoodi’s gas limit to 200 million at the fork. Gas measures computational work on Ethereum. A block gas limit determines the amount of such work a block can accommodate, rather than a fixed number of transactions.

Complex smart contract transactions may consume much more gas than simple transfers. Increasing the limit can create additional processing capacity, but it can also increase the demands placed on the software and hardware that maintain the network.

Hoodi gives developers a place to test how clients respond under the new conditions without immediately exposing Ethereum’s mainnet users to the same changes. The testnet gas limit does not guarantee a corresponding mainnet limit or a particular reduction in transaction fees.

What remains unresolved before mainnet

BlockBriefing previously reported the postponement of the Hoodi upgrade and subsequent discussion of contract-related changes. The new configuration is material progress beyond those earlier reports, although its effectiveness still needs to be demonstrated.

Developers need compatible client releases and a functioning test network before they can assess the activation. The November 26 Lodestar development record anticipates client releases early the following week. Other client changes were still being reviewed.

The next checkpoints are release availability, configuration consistency across clients and the performance of Hoodi after the planned fork. None of the reviewed development records provides a confirmed Ethereum mainnet activation date.

Reporting note: This article is based on public developer records and configuration calculations. It does not represent independent testing of the Ethereum upgrade.

Sources, corrections and methodology

How this reporting is prepared: BlockBriefing uses AI-assisted tools to support research, content preparation, editing and visual production. Information should be assessed against the original sources cited in each article. Our editorial standards explain our verification, authorship and correction procedures.

Article source links appear in the report above. We aim to distinguish independently verifiable facts, attributed claims, and analysis. If you find an error, please share the article URL and supporting documents.

Corrections policy · Editorial standards